Plant schedules

Make plant schedule gCADPlus automates one of the most tedious tasks in the production of landscape CAD drawings. Using two different designs, we show how to automate and customize the generation of a plant schedule.

Plant Schedule

Make plant schedule  We take a landscape design drawing for an enclosed courtyard created using gCADPlus and (after assigning each species symbol use to an entry in a gCADPlus database file) draw a plant schedule. All instances of each species used in the design are counted and we demonstrate how to automatically update the schedule when additions symbols are copied after the schedule was previously created.